12-28-19 Dredging of Falmouth Harbor pumped to Surf Drive Beach.
01-15-20 Dredging of Falmouth Harbor pumped and spread onto Surf Drive Beach.
01-08-20 New Water Line Installation on Main Street
03-15-20 Opening Weekend at Falmouth Dairy Queen – Board Members Terry Saunders and Steve Saunders
03-24-20 Start of work on the new Surf Drive Beach retaining wall.
03-26-20 Main Street during COVID-19 Virus at 12:30 pm. The contract for the installation of new water main and hydrants continue.
03-26-20 Signage on beach reminding of social distancing. Fence installed around the shower. Kindness rocks on the bench placed by Rebecca Westbrook Gonzales Family.
03-28-20 DPW competed the new retaining wall at Surf Drive Beach and sand previously deposited was back filled up to wall. Our Old Stone Dock sign was reinstalled.
04-09-20 Road Reconstruction by Green